This unit stores 7 trays for stone slabs in a silo in order to increase the time between the phase when the resin is first applied on the slab and checking/ touching up. After certain time, the epoxy transforms to the gel phase - the incubation phase, and to fill already emerged cracks and voids, fresh epoxy is added over the slab. Depending on the process cycle of the resin line, the min storage time of a slab is 12 min for checking and touching up.
Technical data
Max lifting capacity kg 6000
Machine length (L) mm 3500
Machine width (W) mm 3331
Machine height (H) mm 6200
Installed electrical power kW 16
Approximate mass Kg 7000